Currently working on…

1.5 MM SQ. Ft. Distribution Center in Houston, Texas

Port of Houston, Texas

Seawall, Salina Cruz, Veracruz

Mayan Train, Stretch 3, machinery workshop, and garage

Patio Martin Carrera, Mexico City
109,000 m² of construction with 10,000 tons of structural steel and 20,000 m3 of structural concrete. Concession for the construction, use, and exploitation of the Modal Transfer Center at Martín Carrera.
- Shopping and entertainment center. With 26,200 m² of profitable area (90 commercial premises).
- Housing tower for 288 apartments.
- New Modal Transfer Area to serve 28 bus transport lines, direct access to 2 Metro stations (for 2 lines), and connection with Metrobus BRT system.

Access Road to Felipe Angeles International Airport

Mexibus Line 1 Expansion

Harris County Precinct 2 – El Dorado Boulevard Road Expansion and Bridge
New Paving expansion from El Dorado Boulevard from two lanes to four from Horsepen Bayou to Clear Lake City Boulevard, with another two-lane bridge across that bayou and a hike-and-bike trail running alongside the whole length.
Traffic along that stretch has increased steadily over the years due to new home construction and also because of the Clear Lake Marketplace at the corner of El Dorado and Clear Lake City boulevards. This project helped to alleviate this issue.

Spruce and 5th Street Road Rehabilitation- City of Bellaire
Spruce and 5th Streets involved street reconstruction with a new two-lane roadway and on-street angled parking. The City desired green space to enhance pedestrian use based on feedback received at public meetings, and Costello completed extensive coordination with the landscape architects.
The project also included a new 12” waterline, upgraded storm sewers with underground detention, coordination with CenterPoint Energy for power pole relocations, and new decorative streetlights. HEB was also undergoing reconstruction, and the projects were coordinated to avoid conflicts with construction and delivery traffic.